
60203_revB Page 8 of 35
PREPARING THE VEHICLE FOR TURBO KIT INSTALLTION
1. Jack the vehicle up to a workable height. Secure the vehicle with jack stands.
2. Remove the negative cable from the battery terminal.
3. Drain the engine coolant.
FRONT END PREPARATION
1. Remove the six plastic clips and two 10mm headed screws from the top of the core support.
2. Remove the three T20 torx headed screws securing both front fender well liners.
3. Remove the two plastic fasteners securing the plastic fender liner to the fender well.
4. Remove the two 10mm headed screws on the underside.
5. Remove the three 10mm headed screws behind headlight and one on the fender edge (both sides).
6. Unplug the light harness on passenger side. Remove the front bumper cover.
Remove 4 Screws
each side