
Issue Date: 2010-03-02 Page 15 of 23 Report Reference # E336418-A29-UL
2010-10-22
IEC 60950-1
Clause Requirement + Test Result - Remark Verdict
4
PHYSICAL REQUIREMENTS
Pass
4.1 Stability N/A
Angle of 10° Based on construction review,
the test was deemed not
necessary.
N/A
Test: force (N)........................................................ : N/A
4.2 Mechanical strength Pass
4.2.1 General Pass
4.2.2 Steady force test, 10 N Pass
4.2.3 Steady force test, 30 N N/A
4.2.4 Steady force test, 250 N No hazards as a result of the
250 N test.
Pass
4.2.5 Impact test Pass
Fall test 500 g steel sphere ball fall
from 1.3 m height onto the
enclosure, there are no safety
relevant damages.
Pass
Swing test N/A
4.2.6 Drop test N/A
4.2.7 Stress relief test No indication of shrinkage or
distortion on enclosures due to
the stress relief test ( 101.3
degree C/7 h).
Pass
4.2.8 Cathode ray tubes N/A
Picture tube separately certified............................ : N/A
4.2.9 High pressure lamps N/A
4.2.10 Wall or ceiling mounted equipment; force (N) ....... : N/A
4.3 Design and construction Pass
4.3.1 Edges and corners All edges and corners judged
to be sufficiently well rounded
so as not to constitute a
hazard.
Pass
4.3.2 Handles and manual controls; force (N)................ : N/A
4.3.3 Adjustable controls N/A
4.3.4 Securing of parts No loosening of parts impairing
creepage distances or
clearances over
supplementary or reinforced
insulation is likely to occur.
Pass