Dil ID: 1
Dil Adı: english
Dil Kodu: en10tayfun UNITe IP Brand's Products
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



3333333333
33
User’s, Installation and Maintenance Manual
9.5 Electrical connections on site
Electrical connection of the system must be made
in accordance with EN 60204-1.
1. Install the top and bottom platform control boxes
and connect the cable connections and the
electrical boxes.
2. Use cable strips to attach the fixed cable to the
tower internal (see Fig. 12).
3. Conect power supply cable.
9.6 Alignment labels installation
1. Stick the alignment label inside the cabin next to
the grid of holes at a height of 1,5 m from cabin
oor.
2. There is an alignment label for each tower
platform. Stick label on right ladder stile at a height
of 1,5 m from each platform, and with triangle
pointing to the left.
3. For top platform, and for ring shape platforms,
stick label on right ladder stile at 0,8 m under each
platform, and with triangle pointing to the left.
10. Disassembling
In accordance with local authority regulations
disassemble in reverse order and dispose.
Fig. 12
F
ALIGNMENT
LABEL
POWER
CABLE
PLUG
POWER
CABLE
SUPPORT
POWER CABLE