Dil ID: 1
Dil Adı: english
Dil Kodu: en5 Wintech Brand's Products
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



8484848484
84
042-288-B0-001, Rev. A2
Fig. 7-10, Load Block, PN-6x-T 7.5kW
(natural gas conguration)
Fig. 7-11, Changing Load Block Conguration, PN-6x-T 7.5kW
7.0 Maintenance, continued
7.8 Fuel Conversion, Natural Gas to LP, continued
7.8.2 Switching the LP Port to the NG Port, PN-6x-T
Required Tools:
7/8" open-end wrench
NFPA-approved pipe sealant
In this procedure, the gas inlet hose is switched from the LP port to the NG port.
Reverse this process if converting from natural gas to liquid propane.
1. Loosen swivel connector and remove from are tting.
2. Turning counterclockwise, remove are tting and plug from unused port.
3. Coat all but last two threads of the are tting and plug.
4. Reinstall are tting and plug into the opposite holes, reconnect hose.
5. Set the selector switch on the Gas Hazard Sensor to the correct setting.
6. Apply gas pressure and test all ttings for leaks with test solution or soapy water.
The following procedure must only be performed by qualied personnel. To prevent
injury, disable generator and disconnect gas supply prior to beginning the gas conversion
procedure.
WARNING!