Marking on Lift Anchor plate:
After installation, marking shall be completely accessible;
otherwise additional marking near the anchor device will
be necessary.
The installation must be performed by a competent
person following the instructions of this manual.
AVANTI LIFT ANCHOR is tested and approved only
to be installed on AVANTI lift. AVANTI LIFT ANCHOR
made from AISI 304 Steel has to be screwed with two
bolts DIN 933 A2-70 M12 mm, 4 washers DIN 125A
A4 and self locking nuts DIN 985 A4 M12. In case of
doubt, please contact AVANTI.
Before installing the AVANTI LIFT ANCHOR in heights,
assure to be proper secured against fall from height by
using relevant fall arrest equipment.
AVANTI LIFT ANCHOR:
1. Fix the anchor point to the structure using
the supplied hardware as shown in the
picture below.
2. Torque the nuts with 15 N·m (11 lb·ft).
3. Make sure the Anchor is fully seated and
properly tightened.
4. Fill in “Installation form”.
5. Carry out yearly inspection by following
the procedure in the section “Inspection”.
Item number
European/American
standard number
Material and Capacity rating
Unique identification number
AVANTI product name
D.4 Installation
D.3 Marking