
............ www.truemfg.com ............
True Food International Equipment, Inc.
5
5
INSTALLATION / OPERATION INSTRUCTIONS
INSTALLATION OF LEGS AND CASTORS
Securing Castors
Toobtainmaximumstrengthandstabilityofthe
unit,itisimportantthatyoumakesureeachcastor
issecure.Thebearingraceonthecastorofthetop
edgeofthelegmustmakefirmcontactwiththerail.
Unit Leveling
Four leveling shims have been provided for leveling castored
units positioned on uneven floors. Shims must be positioned
between rail end and bearing race. TRUE recommends a four
shim limit to any single castor.
A. Turnthebearingracecounter-clockwiseuntil
thecabinetislevel.Levelfronttobackandside
toside.(diagonally)
B. Installthedesirednumberofshims,making
suretheslotoftheshimisincontactwiththe
threadedstemofthecastor.
C. Ifmorethanoneshimisused,turntheslotata
90°anglesotheyarenotinline.
D. Turnthebearingraceclockwisetotightenand
securethecastorbytighteningtheanchoring
boltwitha3/4inchopen-endwrench,socket,
orthetoolprovided.
CAUTIO N
To avoid damage to lower rail assembly, slowly raise unit to
upright position after installing castors.
Thread four screws into castor in the
underside of cabinet frame rail.
Anchor the four screws rmly to the
base of the unit.
1 2