Dil ID: 10
Dil Adı: spain
Dil Kodu: es1tayfun Productos de la Marca Bosch
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



Corporate Office: P.O. Box 21121, Eugene, OR 97402
oregonfuelinjection.com
EUGENE MEDFORD
5. Disconnect injection pump lube line (B).
6. Disconnect fuel shutoff solenoid electrical connector (C).
7. Remove fuel inlet line (D). Remove fuel leak-off line (E).
8. Disconnect fuel supply pump lines (F).
9. Disconnect aneroid line (G).
10. Remove fuel injection line nuts (A).
11. Remove four injection pump drive gear cap screws (C).
12. Remove four mounting stud nuts (8) which secure injection pump to
cylinder block.
13. Carefully remove injection pump from mounting studs and place it on a
clean flat surface.
Installation
If engine was rotated after injection pump was removed, rotate flywheel until
JDE81-4 Timing Pin enters flywheel at No.1 cylinder's "TDC" compression
stroke.
NOTE:
When No. 1 cylinder is at 'TDG" compression stroke, intake and exhaust
valves for No. 1 cylinder will be closed and both rocker arms will be loose.
4036 West 1
st
Ave.
Eugene, OR 97402
(541) 485-1434 • 1-800-452-5055
2221 Tower East Dr
Medford, OR 97504
(541) 773-8669 • 1-800-648-8848
10/10/12
Oregon Fuel Injection