WIRELESS CLOCK SYSTEM
Division 16
Section 16735
Three School Intercom Upgrades: Susitna, Scenic Park, Abbott Loop
Project No 999129 Section 16735 – Page 2 of 4
This organization shall have a minimum of 3 years experience with installation of wireless
timekeeping systems.
1.6 SUBMITTALS
A. Submit product data under the provisions of Division 1 and 16.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver products in factory containers. Store in clean, dry space in original containers.
Protect products from fumes and construction traffic. Handle carefully to avoid damage.
1.8 OWNER TRAINING
A. As specified in Section 16999.
1.9 PROJECT RECORD DRAWINGS
A. Submit documents under provisions of Division 1 and Section 16999.
B. Show locations of all wireless clocks on intercom as-built drawings.
1.10 OPERATION AND MAINTENANCE MANUALS
A. Submit Operation and Maintenance data under provisions of Division 1.
B. Provide operation and maintenance instructions including detail electronic schematic
drawings, detailed parts list and exploded view of all equipment, detailed troubleshooting
instructions and a reduced set of the project record drawings.
1.11 WARRANTY
A. Warrant all materials and equipment to be new and free from defects in material and
workmanship for a period of one year under provisions of Division 1. Warranty service
shall be provided by a trained specialist of the equipment manufacturer.
1.12 EXTRA MATERIALS
A. None required.
PART 2 PRODUCTS
2.1 PRODUCT SPECIFICATIONS
A. Throughout this specification, specific manufacturers and manufacturer’s catalog
numbers are cited. These citations are for the purpose of establishing quality and
performance criteria and are not intended to be proprietary. All decisions regarding
approval of non-specified manufacturers and products will be at the discretion of the ASD
Project Manager.
2.2 ACCEPTABLE MANUFACTURERS – WIRELESS CLOCK SYSTEM
A. Primex “Synchronous Network System (SNS)” or approved equal.
B. Substitutions under provisions of Division 1.