Dil ID: 1
Dil Adı: english
Dil Kodu: en3 Bally-refrigerated-boxes Brand's Products
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



44444
REV: 6/2014 IM-418-11 © 2014 Bally Refrigerated Boxes, Inc. 4
Installing Door Panel
A. Remove the steel-shipping strap mounted at
the bottom of door panel opening. Position
door panel and align with vertical panels
previously installed.
B. Door panel is considerably heavier than vertical
panels and needs to be handled by at least (2)
able-bodied personnel. Ensure that door
panel is plumb and level and lock the
adjoining Speed-Loks. Shim door panel if
needed. If door panel is not installed plumb
and level, the door will not operate properly.
Installing Ceiling Panels
A. The Mortuary Cooler ceiling is made up of (2) ceiling panels that are locked together at the factory. Unlocking the
ceiling panels will damage the refrigeration unit opening.
B. Place ceiling panels on top of Mortuary as shown on the plan view. Align the edges with the vertical panels and
lock top Speed-Loks.
Anchoring Mortuary Cooler
A. Vertical panels are mounted to the building
floor using continuous angle, concrete anchors
and self-drilling metal (TEK) screws.
B. Angles are shipped in stock lengths and must
be cut before installation. Calculate angle
length by measuring inside of wall panels and
subtract 4 ". Angles will start 2" from each end
wall. See Figure 8.
C. Set angle along bottom of vertical panels with
larger holes on floor and mark concrete anchor
holes with a builders crayon or similar method.
D. Drill ¼” hole 2" deep in concrete at marked
locations. Set angles back in place and install
concrete anchors. Install self-drilling metal
screws (TEK) through upright leg of angle
through predrilled holes.
Figure 7:
Lock Verticals Even at Top