
9
745-872-C0-002, Rev. B
1. Locate the mounting holes on the lower left and right side of the PWE enclosure. Use the 1/4" drill
bit to clear the powdercoat from the holes. If there are no mounting holes on your enclosure, drill
a 1/4" hole using the dimensions shown in Fig. 2-1. Mount the GEM brackets to the PWE using
these holes. Secure the brackets with the 1/4" Nylok nuts.
Drill with 3/16" and 1/4" bits• Rivet gun•
Two 1/4"-20 Nylok nuts (provided)• Four .188" rivets (provided)•
#2 Phillips screw driver• Center punch (for some enclosures)•
7/16" open end wrench• Tin Snips (for some enclosures)•
Tape measure (for some enclosures)•
2.0 Installing the GEM Enclosure
The GEM enclosure mounts underneath existing PWE-3 pole-mounted enclosures, and provides for
secure deployment of an AC generator.
Tools and Materials:
Nylok
Nut
6 3/4"
3/8"
Fig. 2-1, Mounting Hole Location
CAUTION!
Take great care in measuring and drilling holes (when necessary). Hole location is critical.
(both sides)