Dil ID: 1
Dil Adı: english
Dil Kodu: en5 Wintech Brand's Products
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



4141414141
41
TM
744-862-C0-003 Rev.C
Engine Control Module (ECM)
5.1 Self-Test
Generator testing can be initiated in four ways:
1. The ECM can be programmed to periodically run an automatic test
(Default OFF).
2. A Self-Test can be commanded via status communications.
3. Momentary activation of the Engine Run command will cause the
ECM to effectively run a test. Note that this method is the least
desirable because the Self-Test Fail alarm will not be set if an
alarm condition arises.
4. A one-minute automatic test is performed when the manual control
switch is returned to Auto from Stop.
Generator testing consists of starting and running the generator for a
programmable period of time (the default test duration is 10 minutes). The
ECM monitors all engine-related signals and will declare a self-test as failed if
any of the following alarms activate during the test:
Low Oil Pressure
Engine Over-temperature
Engine Over-speed
Engine Over-crank
Low Fuel
Alternator Over-voltage
ECM Control Failure
Alternator Not On
Low Ignition Battery
Low DC Bus Voltage
The ECM will not start a self-test if the engine is disabled, the stop switch is
asserted, or the engine is already running.
Section 5, System Self-test and Maintenance