
143
Index
A B C D E F G I L M P R S T V
A
Affixing labels,129
B
Bac
kplane,9
Ba
se card LED,115
C
C
able management examples,141
C
able management guidelines,13 9
C
able routing recommendations,43
C
ard specifications and compatibility,102
C
leaning the air filters,74
C
onfiguration system problems,69
C
onfiguring in-service hardware failure diagnosis and
failure protection,61
C
onfiguring temperature thresholds for a card,59
C
onfirming installation preparations,24
C
onnecting power cords,39
C
onnecting the AC power supply to a power strip with
lightning protection,125
C
onnecting the switch to the network,50
D
Displa
ying alarms present on a card,63
Displa
ying the card information for your switch,55
Displa
ying the electrical label data for your switch,55
Di
splaying the operating state of fans,62
Displa
ying the power supply system of your switch,58
E
En
vironment requirements,98
Ex
amining the installation site,16
Ex
amples,132
F
Fa
n failure,71
Fa
n LEDs,111
Fa
n tray,13
F
illing in labels,129
G
Gr
ounding the switch,33
Gui
delines,13 2
I
I
nstallation tools,22
Installing a c
ard,36
Installing a li
ghtning protector for a network port,126
Installing a su
bcard,38
Installing the
power system,34
Inst
alling the switch in a rack,24
In
terface failure,72
Isolating a c
ard and locating card faults,60
L
L
abels for cables,127
L
abels for devices,129
L
ogging in to the switch,43
LP
U failure,72
LP
U LEDs,113
M
MP
U failure,71
MP
U LEDs,112
P
Ph
ysical architecture,1
Po
wer components,108
P
ower consumption, weight, and dimensions,98
P
ower supply failure,70
P
ower supply LEDs,111
P
ower supply system,10
Po
wering on the switch,47
R
Ra
ck-mounting,21
R
ebooting your switch,57
R
egulatory Compliance Information,88
R
eplacing a card,79
R
eplacing a CF card,84