Dil ID: 6
Dil Adı: turkish
Dil Kodu: tr2tayfun AEG Markası'nın Ürünleri
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



Installation
Unpacking
All transit bolts and packing must be removed before using the appli-
ance.
Using a spanner, unscrew and remove the
rear right-hand bolt and lay the machine on
its back, taking care not to squash the hoses.
This can be avoided by placing one of the
corner packing pieces between the machine
and the floor.
Remove the poly-
styrene base and
take off the bot-
tom panel by
unscrewing the
central screw.
Carefully slide out
the right poly-
thene bag.
Repeat the opera-
tion for the left
and central poly-
thene bags.
Re-fit the bottom
panel using the 4
screws supplied
with the door
hinges (in the plas-
tic bag) and the previously removed screw.
98
P025
132998920 gb.qxd 20/02/01 11.11 Pagina 98 (Nero/Process Black pellicola)