
AcuConnect™ 2.0 Quick Reference Manual
Step 2. Enable Schedule
Check the [Enable] option for Schedule then click [Save] button.
Step 3.Enable Reboot Device in schedule
[Toolbox [Miscellaneous] check [Enable] for Reboot Device in
schedule
]
Select schedule rule [Reboot time] click [Save] button to save
ettings.
f any
ll as any
ence
nd/or these Installation Instructions are not designed to be exhaustive or restrictive they
t or
s initially configured and tested
ible.
for installation
er taxing
h
s
Page 9
ACURA INSTALLATION INSTRUCTIONS
The following instruction is designed to assist the technician or customer in the basic steps of
installing Acura products and makes the assumption that commonsense and previous experience
will aid in the installation. Safety and caution must always take precedence in the installation o
electrical or mechanical system. The correct tools, parts, fasteners, safety equipment as we
instructions, diagrams and schematics must be gathered, reviewed or made available prior to
beginning the process of installation.
The installer is required to prepare in advance the work area and see that the electrical or
mechanical needs of the project are in place before starting and that any other possible interfer
are addressed. A review of the Installation Check List is critical since this list needs to be checked
off and a copy sent back to the supplier so it can be attached to the Customer file. All projects
require the filling out of appropriate forms or else warranty may be limited.
he list aT
are part of a process of total quality management and will help the installer to be in control of the
project.
Please refer to caution and installation guides provided with each piece of equipment, componen
accessory.
In order to receive the best performance out of a new Acura computer system all components
should be installed in a way that allows for ease of operation by customer’s trained personnel or
trainer under regular operating conditions.
Please take a moment to check off the following boxes so the undersigned can verify that the
nstallation is complete and operational. If something is not working ai
please inform the installer immediately so that the problem can be fixed as promptly as poss
Follow up with a Corrective Action Report (CAR) where appropriate.
Below are some points or conditions to watch out for: (Please initial them off as you
proceed)
All parts, components and accessories are received and prepared
Areas to receive equipment are clear and free from obstruction
The mounting system selected is appropriate for the apparatus.
Before attaching brackets make sure there are no hidde
n fluid or wiring obstructions
Use appropriate fasteners and backing as required.
Ensure Power Sources are identified and adequate to operate system without ov
available battery reserve. An Amp hould be completed and additional battery
capacity addressed. Power is direc to a distribution fused block.
Page 10
our survey s
t from battery