–24–
¡ª
Install the indoor unit
1.When routing the piping and wiring from the left or right side
of the indoor unit, cut off the tailings from the chassis in
necessary (shown in Fig.4)
• Cut off the tailings when routing the wiring only.
• Cut off the tailings and tailings 2 when routing both the wiring
and piping.
2.Wrap the piping and wiring and pull them through the cut-off-
tailings hole (shown in Fig. 5).
3.Hang the 2 mounting slots of the indoor unit on the upper tabs
of the real panel and check if it is firm enough.
4.The height of the installed location should be 2.3m or more
from the floor.
NOTE:
All the electrical work must be done by qualified personnel according to national wiring regulation and
this manual.
The power supply is type Y connection. If the supply cord is damaged, it must be replaced by the
manufacturer or its service agent or a similarly qualified person in order to avoid a hazard.
The rated voltage and the exclusive circuit must be used.
Leakage circuit - breaker and air switch of correct capacity must be installed. The air switch of 10A
should be used in models below 2500W cooling capacity (including 2500W), and that of 16A should be
used in models above 2500W capacity.