
bizhub C200 (Phase2) 1-17
Introduction
1
1.6 Space requirements
To ensure that machine operation, consumables replenishing, part replacement, and regular maintenance
can easily be performed, adhere to the recommended space requirements detailed below.
Reminder
When the option is not installed, be sure to allow a clearance of 200 mm or more at the back of this
machine for the ventilation duct.
C200 + DF-612 + JS-505 + PC-105 + PC-204 + MB-502 Unit: mm (inch)
1117 (44)
648 (25-1/2)
229
126.5 (5)
113.5
1261 (49-5/8)
200
373
688 (27-1/16)
352
1151028
1495 (58-7/8)
(9) (4-7/16)
(40-1/2) (4-1/2)
(13-7/8)
14 (11-16)
(7-7/8)