
7
Checklist before installation
Table 6 Checklist before installation
Item Re
uirements
Result
Installation site
Ventilation
• There is a minimum clearance of 10 cm (3.9 in)
around the inlet and exhaust vents for heat dissipation
of the router chassis.
• A ventilation system is available at the installation site.
Temperature 0°C to 45°C (32°F to 113°F).
Relative humidity 10% to 95% (noncondensing).
Cleanness
• Dust concentration 3 × 104 particles/m
3
.
• No dust on desk within three days.
ESD prevention
• The equipment and floor are well grounded.
• The equipment room is dust-proof.
• The humidity and temperature are in the acceptable
range.
• Wear an ESD wrist strap and uniform when touching a
circuit board.
• Place the removed memory module, CF card, or
HIM/MIM on an antistatic workbench, with the face
upward, or put it into an antistatic bag.
• Touch only the edges, instead of electronic
components when observing or moving a removed
memory module, CF card, or HIM/MIM.
EMI prevention
• Take effective measures to protect the power system
from the power grid system.
• Separate the protection ground of the router from the
grounding device or lightning protection grounding
device as far as possible.
• Keep the router far away from radio stations, radar
and high-frequency devices operating in high current.
• Use electromagnetic shielding when necessary.
Lightning
protection
• The grounding cable of the chassis is well grounded.
• The grounding terminal of the AC power receptacle is
well grounded.
• A port lightning arrester is installed. (Optional)
• A power lightning arrester is installed. (Optional)
• A signal lightning arrester is installed at the input end
of an external signal cable. (Optional)
Electricity safety
• Equip an uninterrupted power supply (UPS).
• In case of emergency during operation, switch off the
external power switch.