Dil ID: 11
Dil Adı: russia
Dil Kodu: ru7tayfun Продукция бренда Grandview
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



1-1
1-2
1-3
2-1
2-2
2-3
3-1
3-2
3-3
2-6
2-4
2-5
1
3
2
Install on
the flat
ceiling
GPCN-D200 GPCN-D3040 GPCN-D4060
Connect
main bar
and adjuster
(screws of
accessory ④)
Parts
GPCN-D is combined by GPCN and GPD
GPCN Main Bar Overview
1-1 Top Cap
1-2 Fixation
1-3 Sliding Adjusting Hole
2-1 Main Bar
2-2 Subsidiary Bar
2-3 Front Ornament Board
2-4 Back Ornament Board of Main Bar
2-5 Back Ornament Board of Subsidiary Bar
2-6 Moving Button
GPD Adjustment Overview
3-1 Adjuster
3-2 Hanging Button
3-3 Horizontal Adjusting
Hole
4-1 Installation Bracket
4-2 Vertical Adjusting Hole
4-3 Installation Arm
4-4 Adjustable Screw
4-5 Sliding Installation
Button
4-6 Installation Base
Accessories:
① M6x25 Tapping Screw (4sets)
② 6x50 Wood Screw (4pcs)
③ M5x8 Philips Screw (2pcs)
④ M5x16 Philips Screw (6pcs)
⑤ M5x8 Philips Screw (4pcs)
⑥ M4x8 Philips Screw (4pcs)
⑦ M3x8 Philips Screw (4pcs)
Scope for installation (Installation hole of projector):
Maximum scope for installation:360mm diameter
Minimum scope for installation:50mm diameter
Note: Connect the installation arms to the projector conversely for different installation
holes of projector.
Scope
Maximum diameter: 360mm Minimum diameter: 50mm
Scope for installation (H is the distance between ceiling and projector)
The H of GPCN-D200 is 200mm
The H of GPCN-D3040 is 300mm~400mm
The H of GPCN-D4060 is 400mm~600mm
Scope
Three steps of installation
Install the fixation on the ceiling (screws of accessory or )as
figure 1, and the fixation also can be installed on the ceiling which
angle is less than 15°as figure 2. GPCN-D can be installed to the
concrete-roof with ceiling or without ceiling, such as figure 3.
Connect the GPCN Main Bar Overview to the fixation (screws of
accessory ). Store the power wire, and then fasten the front and
back screws of main bar. Finally, install the ornament board of
main bar as figure 4 and figure 5.
Hang the installation bracket (projecter has been installed) to the
adjuster as figure 6. And then put in the screws (accessory ).but
do not fasten.Pull the top cup to the main bar, and then invaginate
the spring as figure 7
Install on
the ceiling
which angle
is less than
15°
Three steps of installation
figure 1
figure 2
figure 3
figure 4
figure 5
1
figure 6
figure 7
3-3
4-1
4-2
4-3
4-5
4-6
4-4
H
H
H