Dil ID: 11
Dil Adı: russia
Dil Kodu: ru5tayfun Продукция бренда Cisco
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



11-358
Cisco ASR 1000 Series Aggregation Services Routers Hardware Installation Guide
OL-13208-11
Chapter 11 Cisco ASR 1001 Router Overview and Installation
Cisco ASR 1001 Router Power Supply Installation
Step 8 Use a ratcheting torque screwdriver to torque the terminal block plug captive screw (above the installed
wire lead) to from 0.5 Nm (4.425 lbf in. to 0.6 Nm (5.310 lbf in.), as shown in Figure 11-31.
Figure 11-31 Torquing the DC Power Supply Terminal Block Plug Screws
Step 9 Repeat Step 6 through Step 8 for the remaining two DC input power source wires, the positive lead wire
and the negative lead wire.
Figure 11-32 shows how to insert the DC power supply terminal block plug in the block header.
Figure 11-32 Inserting the DC Power Supply Terminal Block Plug in the Block Header
1 Torque is from 0.5 Nm (4.425 lbf in.) to 0.6 Nm (5.310 lbf in.)
207764
1
1 DC power supply negative (-) lead wire 3 DC power supply ground lead wire
2 DC power supply positive (+) lead wire
207696
2
3
1