Dil ID: 8
Dil Adı: italy
Dil Kodu: it2tayfun Prodotti del Marchio AEG
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



39
Installation
Unpacking
All transit bolts and packing must be removed before using the appli-
ance.
Using a spanner,
unscrew and
remove the 2 rear
bottom screws.
Slide out the 2
plastic pins. Lay
the machine on its
back, taking care
not to squash the
hoses. This can be
avoided by placing one of the corner pack-
ing pieces between the machine and the
floor.
Remove the polystyrene block from the
bottom of the machine and release the
two plastic bags.
Carefully slide out the left-hand bag remov-
ing it towards the
right and then
downwards.
Slide out the
right-hand bag
removing it
towards the left
and then upwards.
Set the machine
upright and
remove the
remaining rear
screw. Slide out
the relevant pin.
Plug the open
holes with the
plugs which you
will find in the plastic bag containing the instruction booklet.
You are advised to keep all transit devices so that they can be refitted if the
machine ever has to be transported again.
025
P0001
P1124
2
3
1
P1126
P1127
P1128
P0002
132992870.qxd 13/06/2003 14:49 Pagina 39 (Nero/Process Black pellicola)