
61
Index
C E F G H I L M P S T V
C
Configuration terminal problems,58
Co
nnecting the console cable,50
Co
nnecting the power cords,37
E
Ex
amining the
installation site,21
F
Fa
n
failure,57
Fo
rming an IRF virtual device,44
Fr
ont and rear panels,4
G
Gr
o
unding the switch,33
H
Hot s
w
appable power modules,16
I
Inst
allati
on flow,24
Installati
on of Lightning Arrester for AC Power (Socket
Strip with Lightning Protection),59
In
stallation tools,23
Installing and re
moving a hot swappable power
module,36
Installing and re
moving an interface card,42
Install
ing the switch into a 19-inch rack,25
In
t
erface cards,17
L
LEDs
,
11
M
Mou
n
ting the switch on a workbench,32
P
Po
r
ts,10
Po
wer supply failure,55
Pow
ering on the switch,54
S
S
af
ety recommendations,21
Se
tting terminal parameters,51
Sett
ing up the configuration environment,50
SFP/SFP+/XFP trans
ceiver modules and SFP+/CX4
cables,18
So
ftware loading failure,55
T
T
e
chnical specifications,1
V
V
e
rifying the installation,49