
Remove
Junction Box
Cover
Installation Instructions
• Do not over tighten 90° elbow, water valve bracket
could bend or water valve fitting could break.
• Position the end of the elbow to face the bottom
dishwasher.
STEP 5 INSTALL 90° ELBOW
• Wrap 90° elbow with thread seal tape. Do not use
plumber's putty.
• Install a 90° elbow onto the water valve.
STEP 3 REMOVE TOEKICK
• Remove the 2 toekick screws. Lift off the piece
toekick.
• Measure installation height and dishwasher height.
Extend leveling legs out from the dishwasher base,
1/4" less than installation height.
STEP 2 ADJUST LEVELING LEGS
• Move the dishwasher close to the installation loca-
tion and lay it on its back.
STEP 4 INSTALL POWER CORD
Skip this step if dishwasher will be direct wired. Use
power cord kit WX09X70910 available for purchase from
an authorized GE ealer. The power cord and
connections must comply with local codes and
ordinances.
• Recommended power cord length is 54" min. and
64" max.
Adjust
Installation
Height
• Connect incoming
power cord white (or ribbed)
to dishwasher white, black
(or smooth) to black and ground to dishwasher green
wire. Use UL listed wire nuts of appropriate size.
• Replace junction box cover. Be sure wires are not
pinched under the cover.
Green wire to Green wire ( Ground)
Black wire to Black wire ( Hot)
White wire to White wire ( Neutral)
parts d
cUL/
of the
right
1