
UPDATED: 6/2014 Instruction Manual IM-268-11 2014© Bally Refrigerated Boxes, Inc. 1
Pre-Engineered Walk-In Coolers and Freezers
Installation Manual
Part One: The Bally Walk-In
1. Preparation for Installing the Walk-In 3
2. Operation of the Bally Speed-Lok 3
Part Two: Installation
1. Positioning 4
2. Walk-Ins with Screeds 4
3. Installing Less-Floor Walk-Ins 4
4. Door Installation 5
5. Installing With-Floor Walk-Ins 5
6. Vertical Panel Installation 5
7. Installing Multi-Compartment Walk-Ins 6
Part Three: Other Important Information
1. Preventing Vapor Leaks 6
2. Partition Wall Caulking 7
3. Air Gap Circulation Recommendation 7
4. Making holes for Refrigeration Tubing and Electrical Lines 7
5. Making Electrical Connections to Entrance Doors and Vapor-proof Lights 7
Part Four: Completing the Bally Installation
Completing Installation of the Walk-In 8
1-800-24BALLY | sales@ballync.com