
13
INSTALLATION INSTRUCTIONS
ITEMS TO BE SUPPLIED BY THE INSTALLER
• 3/8” x 3 ½” (minimum) Anchor Bolts (8 per gate)
• 3/8” x 3 ½” (minimum) Anchor Bolts (number will depend on arrangement) (20
per level)
• Miscellaneous support bracing (angle or channel) as required
TOOL REQUIREMENTS
safety glasses hard hat (if job requires)
Allen wrenches to 3/8” screws
5/16” hex head driver bit for TEK hammer
“C” clamps hammer drill
carpenter square 4’ level
chalk line 25’ tape measure
4” angle grinder slip joint pliers
drift punches open end wrench set to 3/4"
drill bits to 3/8” screw driver sets (flat and Phillips)
electric drill socket set, 1/4” and 3/8” drives
hack saw (or port-a-band) taps and tap wrench to 3/8”
extension cords welding equipment
Other items to consider are:
• Cables/chain with 1000 lb lifting capacity
• Chain fall or come-a-long
• Fork lift
• Sledge hammer