
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028 www.shorelandr.com 0004292
Page 11 of 14 11/04/2010
TIRE & WHEEL ASSEMBLY
Mount the tire and wheel assemblies using the 1/2”
fine threaded tapered lug nuts provided. Tighten to
85-95 ft./lb. torque using the rotation pattern as shown
in the ShoreLandr’s Owners Manual.
Re-torque the lug nuts after 50 miles driving and then
periodically thereafter
DUAL AXLE BRAKE INSTALLATION
If your trailer is equipped with dual axle brakes con-
nect the line to the axle as follows:
Cut the tape securing the brake line hose to the axle.
Remove the plastic plug from the bottom port in the
brass blocks of both brake calipers. Thread the brake
hose male end into the block and tighten to either 6-8
ft. lb. or 72-96 in. lb. of torque.
DO NOT OVER TIGHTEN Over tightening will cause
the brass block to crack and then leak.
Attach the brake hose from the connecting kit to the
side port right side of rear axle .Route from the axle to
the spring bracket with the U-shaped hose clip. Once
the brake hoses are secured in place the lines can be
attached.
Locate the brass tee connector. Screw the male port
of the tee into the brake line hose. Tighten. Next
connect the side frame brake hose into the top port on
the tee. Connect the two axles together using the 42”
brake hose supplied. Thread one end of the hose into
the brass tee just installed. Route the hose over to the
other brake line clip on the spring bracket and then
down to the side port in the brass block on the right
caliper of the axle, form a loop using the extra hose in
the line and using the included clips and screws
attach the hose to the side frame to keep it up out of
the way. Tighten to either 6-8 ft. lb. or 72-96 in. lb. of
torque.
DO NOT OVER TIGHTEN Over tightening will cause
the brass block to crack and then leak.
NOTE: The complete brake system including the axle
MUST be bled to ensure that all air has been removed
from the brake system.
For bleeding instructions see the UFP brake bleeding
manual or the ShoreLand’r Disc Brake Manual.
Fill the actuator reservoir with brake fluid and bleed
the line per the instructions in the Brake Manual.
TIRE & WHEEL ASSEMBLY
Mount the tire and wheel assemblies using the 1/2”
fine threaded tapered lug nuts provided. Tighten to
85-95 ft./lb. torque using the rotation pattern as
shown in the ShoreLandr’s Owners Manual.
Re-torque the lug nuts after 50 miles driving and
then periodically thereafter.