R SERIES
The R-series roller rack is installed by placing the roller arm assem-
bly mounting channel over the rear cross member and securing in
place with a 1/2” x 4-1/2” hex bolt and lock nut. (See Diagram A).
Note that it should be left loose until the boat is placed on the trailer.
Once the proper positions is determined, it may be tightened. Re-
peat on the other roller arm assembly.
The short stabilizer bunk is installed to the adjustable bunk bracket
on the front cross member with a 3/8” x 1” hex bolt and lock nut.
(See Diagram A, Detail C).