The R-series roller rack is installed by placing the roller arm
assembly mounting channel over the rear cross member
and securing in place with a 1/2” x 4-1/2” hex bolt and lock
nut. (See Diagram A). Note that it should be left loose until
the boat is placed on the trailer. Once the proper positions is
determined, it may be tightened. Repeat on the other roller
arm assembly.
The short stabilizer bunk is installed to the adjustable bunk
bracket on the front cross member with a 3/8” x 1” hex bolt
and lock nut. (See Diagram A, Detail C).