Dil ID: 8
Dil Adı: italy
Dil Kodu: it2tayfun Prodotti del Marchio AEG
Dünyanın En Büyük
Elektronik Bilgi Kütüphanesi



Installation
Unpacking
All transit bolts and packing must be removed before using the appli-
ance.
Using a spanner,
unscrew and
remove the 2
rear bottom
screws. Slide out
the 2 plastic
pins. Lay the
machine on its
back, taking
care not to squash the hoses. This can be
avoided by placing one of the corner
packing pieces between the machine and
the floor.
Remove the polystyrene block from the
bottom of the machine and release the
two plastic bags.
Carefully slide out
the left-hand bag
removing it
towards the right
and then down-
wards.
Slide out the
right-hand bag
removing it
towards the left
and then
upwards.
Set the machine
upright and
remove the
remaining rear
screw. Slide out
the relevant pin.
Plug the open holes with the plugs which you will find in the plastic bag
containing the instruction booklet.
84
025
P0001
P1124
2
3
1
P1126
P1127
P1128
P0002
132989390_gb.qxd 17/03/2004 10:24 Pagina 84 (Nero/Process Black pellicola)