†Water hook-up fits in back air clearance when calculating installation depth.
If installed against a wall, allow clearance of 14-3/16" on freezer side to
remove bin.
Clearance required to remove fresh food full-size pan without
disassembling is 18-15/16".
Allow additional space for any necessary leveling adjustments.
Height to top of hinge (in.) A 69-1/4
Height to top of case (in.) B 68-3/4
Case depth without door (in.) C
†
23-78
Case depth less door handle (in.) D
†
26-3/4
Case depth with door handle (in.) E
†
29-3/16
Depth with fresh food door open 90° (in.) F
†
45-9/16
Width (in.) G 35-3/4
Width with door open 90°less door handle (in.) H 38-3/16
Each side (in.) 1/8
Top (in.) 1
Back (in.) 1
Air Overall
Clearances Dimensions
For answers to your Monogram,
®
GE Profile
™
or
GE
®
appliance questions, visit our website at
GEAppliances.com or call
GE Answer Center
®
service, 800.626.2000.